top of page
Search


Bypass Culture and Safety Interlocks Turning Protection Into Risk
Bypasses are sometimes necessary, but risk rises when alarms, interlocks, guards, trips, sensors, and shutdown systems are routinely defeated or left impaired. This article explores bypass culture, why it develops, and how organisations can distinguish legitimate temporary impairment from dangerous operational drift.
3 days ago17 min read


Confirmation Bias in Troubleshooting: Preventing Diagnostic Fixation in High Risk Operations
In high-risk operations, the first plausible diagnosis can quickly become the only diagnosis. This article explores confirmation bias, diagnostic fixation, and premature closure in troubleshooting—and how teams can use disconfirming evidence, alternate hypotheses, diagnostic time-outs, and independent review to avoid dangerous misdiagnosis.
Sep 2714 min read


Commissioning Risk Why Finished Construction Is Not Yet a Safe Operating Facility
A facility can be mechanically complete and still be unready for safe operation. This article explores commissioning risk, including energization, hazardous fluid introduction, temporary systems, punch-list exposure, PSSR, SIMOPS, control of work, and the transition from construction to live operations.
Sep 2014 min read
bottom of page
