top of page
Search


Commissioning Risk Why Finished Construction Is Not Yet a Safe Operating Facility
A facility can be mechanically complete and still be unready for safe operation. This article explores commissioning risk, including energization, hazardous fluid introduction, temporary systems, punch-list exposure, PSSR, SIMOPS, control of work, and the transition from construction to live operations.
Sep 2014 min read


Temporary Controls, Permanent Risk: Breaking the Trap Before It Becomes Normal
Industrial facility with temporary piping, scaffolding, barriers, and bypass arrangements, illustrating how short-term controls can become embedded into normal operations.
Aug 1614 min read


Near Miss Reports: Measuring Learning, Not Just Volume
A rising near-miss count can signal trust and engagement, but it can also reflect quotas, weak classification, and low-value reporting. This article explores near-miss inflation and why organizations should focus on report quality, potential severity, control failure, and learning value rather than raw volume.
Jul 1214 min read


The Hidden Risk of Too Many Procedures
More procedures do not always mean better control. When workers face excessive forms, permits, checklists and overlapping requirements, meaningful compliance can be replaced by box-ticking and cognitive overload. This article explores procedural saturation and how organisations can distinguish necessary governance from bureaucratic safety.
May 39 min read


Why Change Initiatives Fail and How the Lippitt-Knoster Model Helps Leaders Succeed
Discover why organizational change fails using the Lippitt-Knoster Model. Learn how vision, consensus, skills, incentives, resources and action planning drive successful change.
Mar 1516 min read
bottom of page
